赌场永利盘口

Xi'an Branch of Shaanxi Sixiang Industrial Co., Ltd., an import and export system solution provider, and the general agent of the famous brand Nimoma in Northwest China

Xi'an access control system detailed installation steps are introduced!

Author: admin Date: 2017/7/11 Hits: QR code sharing

Do you know the detailed steps of Xi'an access control system ? Is there anything to watch out for? Today, the editor of Shaanxi Sixiang Technology Industry Co., Ltd. will introduce you:

The access control system is installed with the main purpose of preventing loss and preventing crime, so it must have extremely high reliability. An access control system may not have an alarm for most of its operation, so no alarm is required. The probability of an alarm requiring an alarm is generally very small, but if the alarm system fails within this extremely small probability, Often it means the advent of disaster. Therefore, in the various stages of design, installation and use of the access control system, reliability design and reliability management must be implemented to ensure the high reliability of products and systems.

In addition, in the system design, equipment selection, commissioning, installation and other links are strictly implemented in accordance with national or industry standards, as well as the requirements of public security departments on safety and technical precautions, products must pass a number of authoritative certifications, and have many typical User, normal operation for many years. Security access control and security systems are used to protect people and property, so the system itself must be safe. The high security mentioned here also refers to the natural or quasi-natural attributes of the product or system. It should ensure the safety of equipment and system operation and the safety of the operator.


西安门禁系统

First, equipment installation


1.Front-end equipment


2. Central control room equipment


Equipment debugging


1. After the system installation is completed, firstly connect a signal of the access control card reader to the host, and then separately detect the condition of the access control card reader, and whether there are any false positives or false positives. After checking this way, there is no problem in accessing the other way. In this way, each way is tested separately, and all lines are connected after confirmation.


2. The management personnel can authorize according to the authority of the users. For example, some personnel can enter and exit any place at any time. Ordinary personnel can only enter and exit the authorization scope within the authorization time with the authorization card. When all the access points are opened normally and illegally, check the computer in the control center for records.


3. Attempt that the central computer cannot be connected to the controller due to malfunction or other reasons. Can the controller independently record the relevant information of the controlled door points? After the central computer is connected, can all information be automatically uploaded and whether the information record can be guaranteed to be complete Sex.


4. Make a good record of commissioning.


5. Fill in the completion report later.


Third, the pipeline installation


1. The installation engineering wiring shall comply with the national regulations "Code for Construction and Acceptance of Electrical Installation Engineering" and the relevant codes and regulations issued by the state. Threading in pipes or ducts should be performed after construction plastering and ground works are completed. Before threading, the water and debris in the pipe or wire groove should be removed. Lines with different systems, different voltage levels, and different current categories should not be worn in the same pipe or in the same slot in a cable trunk. There should be no joints or kinks in the wires or ducts. The connector of the wires should be soldered in the junction box or connected with terminals. Small cross-section system connections can be spliced. The number of spliced turns should be more than five turns, then tinned and wrapped with insulation tape. Compensation measures shall be taken where the pipeline passes through the deformation joint of the building, and the conductors shall be fixed on both sides across the deformation joint with appropriate margin. The terminals in the terminal box should be crimped or terminal boards with solder joints. The terminals should be labeled accordingly.


2. The access controller shall be installed firmly, shall not be inclined, and shall have obvious signs. Installation on light partition walls should be strengthened. The cables or wires introduced into the access controller should be neat and avoid crossover, and the cable core wire and the part of the matched conductor should be fixed and numbered, and should not be easily discolored with the drawing; the terminal board and each terminal, wiring No more than two cables should be left; there should be no less than 20cm of cable core and conductors; the conductors should be bundled into bundles; after the lead wires of the conductors are threaded, they should be blocked at the inlet pipe.


3. The main power supply lead-in of the access controller should be directly connected to the power supply. It is strictly forbidden to use a power plug. The main power supply should be clearly marked. The ground of the access controller is firmly grounded and clearly marked.


4. The routing and specifications of the ground bus in the monitoring room shall meet the design requirements. The construction should comply with the following regulations: the surface of the ground bus should be complete without obvious damage and residual flux slag, copper tape bus light, slip and no burrs, the insulation layer should not have aging cracks; the ground bus should be laid on the ground trough or cable The center of the aisle is fixed on the outside of the rack groove. The bus bar should be flat and free of skew and bend. The connection of the bus bar to the rack or the top of the machine should be firm; the copper strip bus bar on the cable aisle can be fixed by screws; the copper stranded bus bar on the cable aisle should be tied to the rung; Strictly follow the design requirements. Grounding installation shall be carried out simultaneously with civil construction.


西安门禁系统安装

Case Show

CASE SHOW
  • Case of Qinghai Sanmao Kindergarten Lifting Column
    青海三毛幼儿园升降柱案例

    The company has always been adhering to the business philosophy of leadership, integration, and innovation, and strives to build a truly cross-border integrated entity enterprise. Address of the head office: Middle section of Cangcheng Road, Linwei District, Weinan City ...

    Learn more
  • Hotel road pile case
    宾馆路桩案例

    In the two years since the establishment of the company, one of its existing branches and one subsidiary has operated simultaneously. They are: Xi'an Branch: Shaanxi Sixiang Technology Industrial Co., Ltd., registered in 2017 ...

    Learn more
  • Case of Automatic Lifting Column of Xi'an Aviation Police Brigade
    西安航空警务大队自动升降柱案例

    Xi'an Branch Address: 408-410, Building A, Eurasia International, Eurasia Avenue, Xi'an Ecological District. Weinan Subsidiary: Weinan Old Treasurer Trading Company, established in 2015 ...

    Learn more
  • Anti-collision column
    部队升降防冲撞柱

    Shaanxi Sixiang Industrial Co., Ltd. and its subsidiaries and subsidiaries are adopting more advanced technology, a wider Internet platform, more reliable products, better management systems and more comprehensive ...

    Learn more
  • Power station telescopic pile
    电厂伸缩路桩

    Xi'an Branch Address: 408-410, Building A, Eurasia International, Eurasia Avenue, Xi'an Ecological District. Weinan Subsidiary: Weinan Old Treasurer Trading Company, established in 2015 ...

    Learn more

Express Lane

support hotline

13259907888 13259907888

Email: 3088532955@qq.com

QQ: 3088532955

陕西思翔实业有限责任公司西安分公司

Copyright: Shaanxi Sixiang Industrial Co., Ltd. Xi'an Branch

Record number: Shaanxi ICP No. 17010527-1 Site Map RSS XML Xi'an | Weinan | Hanzhong | Yulin | Baoji | Shaanxi | Xianyang | Shangluo | Ankang | Yan'an |
Contact: Manager Wang Phone: 029-86630967 万家灯火 Technical support: unlimited power
Address: 408-410, Block A, Eurasia International, Eurasia Avenue, Xi'an Ecological District, Xi'an National Service Hotline: 13259907888 E-mail: 3088532955@qq.com
Xi'an Branch of Shaanxi Sixiang Industrial Co., Ltd. is mainly engaged in the products of Xi'an access control system, Xi'an road gate, Xi'an intelligent parking system, Xi'an road gate system.
陕西思翔实业有限责任公司西安分公司 QR code for mobile station
online service
hotline
13259907888
13259907888
After-sales phone
029-86630967
Xinjiang Office
13909923433
手机站二维码
QR code for mobile station
老葡京线上赌博 皇冠真人赌城赌场 澳门网上买彩网址 真钱滚球网盘口 澳门网上买彩票平台 365足球开户入口 bb赌博网投注 葡京娱乐ag厅 真人皇冠正规赌博 线上真人买彩票网站